If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
Can you sync a piece of clip art to a timeline milestone
Can you tie/sync a piecce of clip art (a checkered flag) to a critical
milestone on a visio timeline ? |
#2
|
|||
|
|||
Can you sync a piece of clip art to a timeline milestone
Yes. First, go to the menu bar View Drawing Explorer window. Expand the
Foreground Pages in the DEW. Expand the page of interest, expand the shapes. The various milestones will be displayed. If you just have one, it out to say something like Diamond milestone, otherwise it will have a number assigned, e.g., Diamond milestone.40. Place your checkered flag where you want it vertically, above or below the timeline. Right click and open it's shapesheet. In the 1st section, Shape Transform, edit the PinX value, e.g., Diamond milestone!PinX or Diamond milestone.40!PinX. This syncs the flag to the diamond. Close the shapesheet. Your flag should follow the diamond. HTH Wapperdude. "brv249853" wrote: Can you tie/sync a piecce of clip art (a checkered flag) to a critical milestone on a visio timeline ? |
Thread Tools | |
Display Modes | |
|
|