My Schedule: Am I dreaming?
First, I'm sorry to have written a novel. But from what I've seen so far I guess the planning stages are the most important, and if someone can offer assistance, they need as much information as possible. I want to create a schedule that automatically updates information in a table based on information from various worksheets. Curently, this is all done by hand for all grades and classes. Basic info: My school has class 22 day a month; Monday through Friday and the 2nd and 4th Saturday. Each weekday has six periods, Saturdays have four. There are three different grades; some grades have class one time a week, others have class two times a week. Grades that meet once a week have 27 classes; grades that meet twice a week have 54 classes. I've just started out and all I have made is a worksheet with the dates in COL A and the class periods (1-6) in COL B-G. In each row beside the date, I've put the proper class in the corresponding class period. I'd like the table to look something like a schedule; Sunday-Saturday across the top and periods 1-6 in a column under each day. The information I need in the table is what class number will be taught. They need to be counted in sequence an the totals have to carry from month to month. Example: On Monday 1st period the H2A class has a class; so April week 1, Monday - period 1 shows H2A Class 1 April week 2, Monday - period 1 shows H2A Class 2 April week 3, Monday - period 1 shows H2A Class 3 April week 4, Monday - HOLIDAY 1 shows H2A no class May week 1, Monday - period 1 shows H2A Class 4 May week 2, Monday - SCHEDULE CHANGE period 1 (shows J1B Class 6 instead) May week 3, Monday - period 1 shows H2A Class 5 May week 4, Monday - period 1 shows H2A Class 6 To make matters more complicated, because Saturday classes are only twice a month, they are rotated into the schedule. Sometimes Wednesday period 1-4 is replaced with Saturday period 1-4. Sometimes Thursday period 5-6 is replaced with Saturday period 1-2, and Friday period 5-6 is replaces with Saturday period 3-4 So, I need the cells in the schedule table to report the information this way; they need to count all the times a class occurs to date and display the count in a cell for a given day on a given period. Simply counting all the instances that 'H2A' appears in the Monday, first period cell doesn't work, because a schedule change may shift that class to another day or period. So here's the question: can any one suggest a format for the worksheet besides the one I mentioned above? Since I plan to make a pivot table to display the information should I break it down a little more to make it easier to build the table? I.e. Should I add another column for month and week? Anyway, I guess the first task is to get the basic schedule worksheet set up properly. Second is to build a table to display the info (along with formulas to get the info?) If I can get that far, just to have the class, e.g., H2A to display in a cell, along with what number class it is that would be great. After that, I'd like to get information from another table that says what the contents of the class are, print, review, test, presentation, etc. |
#2
|
|||
|
|||
My Schedule: Am I dreaming?
Hi JEM - I did something like this for a company schedule
but I'm not an MVP just a user. As I understand it the variables are the class, the module taught, the date it's taught and the period it's taught. What are you trying to count and why? (i.e. are you trying to make sure each class get enough classes, each module is taught, or what) -- I kinda got lost on the counting part. Ian. -----Original Message----- First, I'm sorry to have written a novel. But from what I've seen so far I guess the planning stages are the most important, and if someone can offer assistance, they need as much information as possible. I want to create a schedule that automatically updates information in a table based on information from various worksheets. Curently, this is all done by hand for all grades and classes. Basic info: My school has class 22 day a month; Monday through Friday and the 2nd and 4th Saturday. Each weekday has six periods, Saturdays have four. There are three different grades; some grades have class one time a week, others have class two times a week. Grades that meet once a week have 27 classes; grades that meet twice a week have 54 classes. I've just started out and all I have made is a worksheet with the dates in COL A and the class periods (1-6) in COL B-G. In each row beside the date, I've put the proper class in the corresponding class period. I'd like the table to look something like a schedule; Sunday-Saturday across the top and periods 1-6 in a column under each day. The information I need in the table is what class number will be taught. They need to be counted in sequence an the totals have to carry from month to month. Example: On Monday 1st period the H2A class has a class; so April week 1, Monday - period 1 shows H2A Class 1 April week 2, Monday - period 1 shows H2A Class 2 April week 3, Monday - period 1 shows H2A Class 3 April week 4, Monday - HOLIDAY 1 shows H2A no class May week 1, Monday - period 1 shows H2A Class 4 May week 2, Monday - SCHEDULE CHANGE period 1 (shows J1B Class 6 instead) May week 3, Monday - period 1 shows H2A Class 5 May week 4, Monday - period 1 shows H2A Class 6 To make matters more complicated, because Saturday classes are only twice a month, they are rotated into the schedule. Sometimes Wednesday period 1-4 is replaced with Saturday period 1-4. Sometimes Thursday period 5-6 is replaced with Saturday period 1-2, and Friday period 5-6 is replaces with Saturday period 3-4 So, I need the cells in the schedule table to report the information this way; they need to count all the times a class occurs to date and display the count in a cell for a given day on a given period. Simply counting all the instances that 'H2A' appears in the Monday, first period cell doesn't work, because a schedule change may shift that class to another day or period. So here's the question: can any one suggest a format for the worksheet besides the one I mentioned above? Since I plan to make a pivot table to display the information should I break it down a little more to make it easier to build the table? I.e. Should I add another column for month and week? Anyway, I guess the first task is to get the basic schedule worksheet set up properly. Second is to build a table to display the info (along with formulas to get the info?) If I can get that far, just to have the class, e.g., H2A to display in a cell, along with what number class it is that would be great. After that, I'd like to get information from another table that says what the contents of the class are, print, review, test, presentation, etc. . |
#3
|
|||
|
|||
My Schedule: Am I dreaming?
A reply to my post! (smile!) I never expected it, I stopped watching this
one a while ago. Hope you are still out there. Anyway, to answer your question: 'As I understand it the variables are the class, the module taught, the date it's taught and the period it's taught. What are you trying to count and why? (i.e. are you trying to make sure each class get enough classes, each module is taught, or what) I kinda got lost on the counting part.' If the schedule remained static it wouldn't be a problem to track the classes and modules, but the schedule is always in a state of flux. That is, we get the basic schedule for the year with all that national holiday and events blacked out and start from there. Based on the Monday though Saturday schedule we have we can manually count the classes and figure out the modules. However, periodically (every week or ten days) there is a schedule change. For example, before a testing period, the headmaster discovers some classes will not have enough class periods before the exam so the classes get switched around, Thursday 1-4 changes to Saturday 1-4 and Thursday 5-6 becomes Monday 1-2, etc. it gets really confusing. So when one class receives and extra period or loses a period all classes modules that occur after that have to be changed (+1 or -1 class module) for the entire year. Then, a week or ten days later, if we receive another schedule change the schedule has to be adjusted again. I have 5 JHS classes that meet twice a week and 7 SHS classes that meet once a week. In just one month, I've had to recount the classes six or seven times. It's mind boggling. (For example, three of my J1 classes meet on Monday, so I teach lesson 1, then each one of them is taught again on Tuesday, Wednesday, and Thursday, so I teach lesson 2, but let's say there is no Tuesday class. The following Monday, I teach lesson 3 to two classes and lesson 2 to the classes that didn't have class the previous Tuesday. I'll leave it at that for now, if you see this post and can catch what I'm trying to do let me know. Also, I'd be happy to post more information or links to show you sme examples of what I'm trying to do. Thanks! "Ian" wrote in message ... Hi JEM - I did something like this for a company schedule but I'm not an MVP just a user. As I understand it the variables are the class, the module taught, the date it's taught and the period it's taught. What are you trying to count and why? (i.e. are you trying to make sure each class get enough classes, each module is taught, or what) -- I kinda got lost on the counting part. Ian. -----Original Message----- First, I'm sorry to have written a novel. But from what I've seen so far I guess the planning stages are the most important, and if someone can offer assistance, they need as much information as possible. I want to create a schedule that automatically updates information in a table based on information from various worksheets. Curently, this is all done by hand for all grades and classes. Basic info: My school has class 22 day a month; Monday through Friday and the 2nd and 4th Saturday. Each weekday has six periods, Saturdays have four. There are three different grades; some grades have class one time a week, others have class two times a week. Grades that meet once a week have 27 classes; grades that meet twice a week have 54 classes. I've just started out and all I have made is a worksheet with the dates in COL A and the class periods (1-6) in COL B-G. In each row beside the date, I've put the proper class in the corresponding class period. I'd like the table to look something like a schedule; Sunday-Saturday across the top and periods 1-6 in a column under each day. The information I need in the table is what class number will be taught. They need to be counted in sequence an the totals have to carry from month to month. Example: On Monday 1st period the H2A class has a class; so April week 1, Monday - period 1 shows H2A Class 1 April week 2, Monday - period 1 shows H2A Class 2 April week 3, Monday - period 1 shows H2A Class 3 April week 4, Monday - HOLIDAY 1 shows H2A no class May week 1, Monday - period 1 shows H2A Class 4 May week 2, Monday - SCHEDULE CHANGE period 1 (shows J1B Class 6 instead) May week 3, Monday - period 1 shows H2A Class 5 May week 4, Monday - period 1 shows H2A Class 6 To make matters more complicated, because Saturday classes are only twice a month, they are rotated into the schedule. Sometimes Wednesday period 1-4 is replaced with Saturday period 1-4. Sometimes Thursday period 5-6 is replaced with Saturday period 1-2, and Friday period 5-6 is replaces with Saturday period 3-4 So, I need the cells in the schedule table to report the information this way; they need to count all the times a class occurs to date and display the count in a cell for a given day on a given period. Simply counting all the instances that 'H2A' appears in the Monday, first period cell doesn't work, because a schedule change may shift that class to another day or period. So here's the question: can any one suggest a format for the worksheet besides the one I mentioned above? Since I plan to make a pivot table to display the information should I break it down a little more to make it easier to build the table? I.e. Should I add another column for month and week? Anyway, I guess the first task is to get the basic schedule worksheet set up properly. Second is to build a table to display the info (along with formulas to get the info?) If I can get that far, just to have the class, e.g., H2A to display in a cell, along with what number class it is that would be great. After that, I'd like to get information from another table that says what the contents of the class are, print, review, test, presentation, etc. . |