If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#1
|
|||
|
|||
MS Project Links to Excel
I have a WinXP Pro PC with SP1, MS Project 2002 & MS Office 2002.
I put links in the notes of a Project to specific cells of an Excel spreadsheet. If I open the project and reply that I do not want to have the links updated it works fine and it can even follow the links. If I open the project and reply that I want the links to be updated, it freezes as project takes 100% of the CPU time. Please let me know if there is a way arround this. |
Thread Tools | |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Excel Links | Ryan | General Discussion | 2 | July 16th, 2004 03:46 PM |
Manually editing links to Excel charts | user | Powerpoint | 1 | June 22nd, 2004 08:27 PM |
Coverting Lotus 123 files to use with excel | Muffin1947 | General Discussion | 6 | June 20th, 2004 10:18 AM |
Excel Links to files on network not updating | Bobbie Jo | Worksheet Functions | 0 | January 13th, 2004 09:02 PM |
Automatic Links in Excel 2003 | Bernie | Links and Linking | 0 | December 16th, 2003 02:16 PM |