If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
Formatting question with Round
I have a Proposal, in the proposal there is a sheet that gathers the the
facility upgrade cost, production man hours, by building and other info. One thing I need for this sheet to do is take the Production hrs per building and calculate installation days per building. Here is the formula I am using: =IF(E56,1,ROUND(E5/($F$3*8)*1.3,0)) In this case: E5 is (7.9) Production Hrs By Building and is gathered from the Costing Tab or Sheet in the Proposal F3 is estimated crew size of (3) and is gathered from the Costing Tab or Sheet in the Proposal Currently I am getting irratic calculations shown below. I would like for it to show a part of a day if it is 7.9 hours to do the job and there are 3 men working 8 hours a day it should show something like 0.34 intallation time day with a Safety Factor. Production Hrs By Bldg Installation Time (Days) with Safety Factor E5 7.9 0.0 E6 0.8 1.0 E7 3.2 1.0 E8 6.4 0.0 E9 3.3 1.0 E10 19.5 1.0 |
#2
|
|||
|
|||
Formatting question with Round
Dave - Your last argument in the Round function is telling it to round it to
0 decimal places. =IF(E56,1,ROUND(E5/($F$3*8)*1.3,2)) might be more to your liking "DaveOfArkansas" wrote: I have a Proposal, in the proposal there is a sheet that gathers the the facility upgrade cost, production man hours, by building and other info. One thing I need for this sheet to do is take the Production hrs per building and calculate installation days per building. Here is the formula I am using: =IF(E56,1,ROUND(E5/($F$3*8)*1.3,0)) In this case: E5 is (7.9) Production Hrs By Building and is gathered from the Costing Tab or Sheet in the Proposal F3 is estimated crew size of (3) and is gathered from the Costing Tab or Sheet in the Proposal Currently I am getting irratic calculations shown below. I would like for it to show a part of a day if it is 7.9 hours to do the job and there are 3 men working 8 hours a day it should show something like 0.34 intallation time day with a Safety Factor. Production Hrs By Bldg Installation Time (Days) with Safety Factor E5 7.9 0.0 E6 0.8 1.0 E7 3.2 1.0 E8 6.4 0.0 E9 3.3 1.0 E10 19.5 1.0 |
#3
|
|||
|
|||
Formatting question with Round
Thank you that helps.
Could you help me with one other thing in the formula. If you will notice that E5 gives an installation days of (0.0) and E6 gives an installation days of (1.0). 7.9 is than 0.8 why doesn't it show it as it should be? By the way with your new formula E5 now shows installation days of (0.43) which is correct. But it still shows (1.00) for E6. Production Hrs By Bldg Installation Time (Days) with Safety Factor E5 7.9 0.0 E6 0.8 1.0 E7 3.2 1.0 E8 6.4 0.0 E9 3.3 1.0 E10 19.5 1.0 "Duke Carey" wrote: Dave - Your last argument in the Round function is telling it to round it to 0 decimal places. =IF(E56,1,ROUND(E5/($F$3*8)*1.3,2)) might be more to your liking "DaveOfArkansas" wrote: I have a Proposal, in the proposal there is a sheet that gathers the the facility upgrade cost, production man hours, by building and other info. One thing I need for this sheet to do is take the Production hrs per building and calculate installation days per building. Here is the formula I am using: =IF(E56,1,ROUND(E5/($F$3*8)*1.3,0)) In this case: E5 is (7.9) Production Hrs By Building and is gathered from the Costing Tab or Sheet in the Proposal F3 is estimated crew size of (3) and is gathered from the Costing Tab or Sheet in the Proposal Currently I am getting irratic calculations shown below. I would like for it to show a part of a day if it is 7.9 hours to do the job and there are 3 men working 8 hours a day it should show something like 0.34 intallation time day with a Safety Factor. Production Hrs By Bldg Installation Time (Days) with Safety Factor E5 7.9 0.0 E6 0.8 1.0 E7 3.2 1.0 E8 6.4 0.0 E9 3.3 1.0 E10 19.5 1.0 |
#4
|
|||
|
|||
Formatting question with Round
OK, look at your formula. The first test in the IF() is whether the value in
column E is less than 6 and, if so, return a 1, OTHERWISE do the ROUND() portion of the calculation. Since .8 is far less than 6, the first test passes and the formula gives you the 1. I sense the first test in the IF() is either unneeded, or does not embody the proper logic. "DaveOfArkansas" wrote: Thank you that helps. Could you help me with one other thing in the formula. If you will notice that E5 gives an installation days of (0.0) and E6 gives an installation days of (1.0). 7.9 is than 0.8 why doesn't it show it as it should be? By the way with your new formula E5 now shows installation days of (0.43) which is correct. But it still shows (1.00) for E6. Production Hrs By Bldg Installation Time (Days) with Safety Factor E5 7.9 0.0 E6 0.8 1.0 E7 3.2 1.0 E8 6.4 0.0 E9 3.3 1.0 E10 19.5 1.0 "Duke Carey" wrote: Dave - Your last argument in the Round function is telling it to round it to 0 decimal places. =IF(E56,1,ROUND(E5/($F$3*8)*1.3,2)) might be more to your liking "DaveOfArkansas" wrote: I have a Proposal, in the proposal there is a sheet that gathers the the facility upgrade cost, production man hours, by building and other info. One thing I need for this sheet to do is take the Production hrs per building and calculate installation days per building. Here is the formula I am using: =IF(E56,1,ROUND(E5/($F$3*8)*1.3,0)) In this case: E5 is (7.9) Production Hrs By Building and is gathered from the Costing Tab or Sheet in the Proposal F3 is estimated crew size of (3) and is gathered from the Costing Tab or Sheet in the Proposal Currently I am getting irratic calculations shown below. I would like for it to show a part of a day if it is 7.9 hours to do the job and there are 3 men working 8 hours a day it should show something like 0.34 intallation time day with a Safety Factor. Production Hrs By Bldg Installation Time (Days) with Safety Factor E5 7.9 0.0 E6 0.8 1.0 E7 3.2 1.0 E8 6.4 0.0 E9 3.3 1.0 E10 19.5 1.0 |
Thread Tools | |
Display Modes | |
|
|