|
|
Drawing a line in bar chart by
Julien
How to draw a line in bar chart which corresponds to a fixed value and would
allow to compare the other values represented by the bars?
Thanks a lot for your...
|
|
1 |
109 |
|
|
ADD NEGATIVE NOT POSATIVE by
mark d davis
EXAMPLE..
A1:(295.00) A35:295
A1:295 A35:295
A50=A1:(295)+A35:
IF A1: IS A POSATIVE NUMBER DO NOT ADD TO A35: BUT IF A1:IS A NEGATIVE
NUMBER ADD TO A35:
|
|
6 |
505 |
|
|
Scatterplot Question by
Tmblweed
I have a few points, graphed as a scatterplot and the points are connected by
a smooth line. (For example: (0,0), (5, 6), (6, 8), (10, 20).)
Since the points...
|
|
3 |
137 |
|
|
Add the last value as a label by
maperalia
I want to add the last value of the "Y" on the graph. The last value's row
location varies.
So I need something to read it and label it in the graph...
|
|
2 |
139 |
|
|
printing charts in a mail merge document. by
chips
I have a spreadsheet with about 300 rows contining data on students. I
can mail merge this to print out reports but would like to make the
recorded progress...
|
January 5th, 2006 07:59 PM
by chips
|
0 |
117 |
|
|
|
|
0 |
100 |
|
|
|
|
2 |
272 |
|
|
|
|
1 |
162 |
|
|
|
|
1 |
163 |
|
|
|
|
1 |
124 |
|
|
Combining Scatter Plots by
TKL
Is there a simple way to combine two sets of X-Y data on one plot. Note here
that the X values in the two sets are not the same.
|
|
1 |
127 |
|
|
How can I create SPC charts in Excel by
Sarahp
Looking to use SPC charts in my company to monitor process performance. It
wouldn't be feasible to provide specialist software to teams - the only
workable...
|
January 5th, 2006 10:07 AM
by Sarahp
|
2 |
195 |
|
|
PivotCharts, PivotTables, I'm going insane by
CBA88
Pardon my lengthy post, but I don't see an alternative to describing in
detail my quandary dilemma.
What I am hoping to accomplish:
Refresh/Update multiple...
|
|
3 |
165 |
|
|
Header by
maperalia
I setup up the "filename" on the left side of the Chart. However, I want to
add just the "directory name" in the right side. The chart page setup just
allow me...
|
|
0 |
55 |
|
|
Question about graphing four sets of data by
RawlinsCross
So i have four columns of data. The first column contains just names.
I want the names to appear as the x-axis. The second column is slowest
time, the third...
|
|
2 |
68 |
|
|
non linear regression in excel by
Nikeel
Hello I have some charts which I am trying to fit lines of best fits to.
The general shape of these curves is something representing '4 o' clock' on
a clock.
I...
|
|
1 |
119 |
|
|
|
|
1 |
88 |
|
|
Help me by
ejennings
Is there a way to make a single gridline bolder than the rest?
|
|
1 |
77 |
|
|
How can i link arrows with cell? by
Sandip
I had tables.. And in that some cells were pointed by arrows. (One value
derived by content of other cell, TO give it a legibility arrow beteen these
two cell...
|
|
1 |
81 |
|
|
|
|
4 |
122 |